国产精品乱码免费一区二区,精品国产美乳自慰无线播放,亚洲拍拍免观视频,男人搞女人的视频,国产69精品久久久,精品视频在线免费观看,爱看av乱伦电影,国产在线观看播放

8613564568558

SEMW’s “Green Pile Installation Equipment” tackles construction within the protection zone of an intercity railway, showcasing a “green, non-displacement” solution!

SEMW

In the center of the empty construction site, two striking “lake green” lights stand quietly between heaven and earth, like two silent giants, their drills steadily and powerfully probing deep into the earth, laying a solid and green foundation for future commercial buildings and hotels.

Recently, two SEMW SDP220s

Static drilling method for root pile construction drilling rig

Working along the edge of a tunnel presents a significant challenge, akin to “face-to-face construction.”

“This is the ultimate test of settlement, vibration, and deformation monitoring technologies.”

It must be carried out under a “zero tolerance” safety standard.

The two operating machines are designed with green, efficient, and safe features as their core principles.

Showcase a “green, non-displacement” solution!

The Xiangheli Fashion and Creative Center project in Jiaxing, Zhejiang Province, is located on the north side of Xiaxu Highway and the west side of Fengxiang Road in Haining City. The total land area of the project is 14,038 m2, and the proposed buildings mainly include: a 1-story garbage room, 3 commercial buildings of 4-11 stories, a 10-11 story hotel, an adjacent 2-4 story podium, and a 1-story basement.

?SEMW

The construction site is located adjacent to an intercity railway on the south side. The net distance between the pile foundation construction surface and the outer edge of the intercity railway tunnel structure is extremely small, only 34.52m. This is close to the stress-sensitive zone of the tunnel, which is considered extreme close-contact construction. Furthermore, the piles on the north side are about 20m away from the nearest existing residential buildings , which places extremely stringent requirements on pile foundation displacement, vibration, and control of soil displacement from the piles.

“Working on the edge of a tunnel is like dancing on a knife’s edge; every step must be precise, with almost zero room for error.” However, the SEMW SDP220 static drilling rig for pile driving, with its advantages of being environmentally friendly, energy-saving, vibration-free, low-noise, and highly efficient, truly demonstrates its superiority in this environment. During construction, the equipment’s pure electric drive, vibration-free operation, and low noise effectively protect the surrounding environment. Simultaneously, the equipment employs intelligent construction management software to monitor the construction process in real time, ensuring construction quality. All construction data is clearly displayed, automatically stored, and remotely monitored.

?SEMW

The total construction area of the project is approximately 44,436 m2 (of which the underground construction area is 10,745 m2 ). The project uses the static drilling and root-planting pile method for the pile foundation construction. A total of 777 root-planting piles are used, with a pile length of 30-49 m, a total pile length of 31,937 m, a pile diameter of 600 mm, an enlarged base diameter of 960 mm, and an enlarged base height of 2,000 mm.

Construction Company: Jujiang Construction Group Co., Ltd.

Pile type selected: Shanghai Zhongchun Gaoke Pile Industry Co., Ltd.

PHC-500(100)AB+PHDC 500-390(90)AB

?SEMW

The SDP220H static drilling rig for pile driving utilizes years of accumulated R&D expertise in deep mixing drilling rigs, featuring high torque, deep drilling depth, high reliability, and high construction efficiency. This project completed the driving of 10 piles, approximately 300-400 meters long, in 12 hours . While ensuring construction efficiency, it is environmentally friendly, energy-saving, vibration-free, and low-noise, employing advanced hydraulic underreaming technology. The drilling tools are specially designed and manufactured, offering high strength, good bending resistance, and excellent wear resistance, reducing maintenance costs.

The on-site construction manager remarked:

This project was very challenging. The clearance between the pile points and the outer wall of the tunnel was very close. The soil squeezing effect and vibration load generated by the pile foundation construction may affect the surrounding tunnels and residential buildings. The equipment from Shanggong is fully electric, with no vibration and very little noise, which is very suitable for the project construction. I would like to give Shanggong’s equipment a good review!

?SEMW

A balance of challenge and performance, combining energy saving and efficiency.

Safety and reliability go hand in hand, green and environmental protection coexist.

Green pile foundation planting equipment

Not only does it provide the “pillar foundation” for this challenging project.

Furthermore, SEMW manufactures green and intelligent products.

Injecting surging momentum into the green pile foundation industry upgrade

?


Post time: Dec-19-2025